Multi-Use Path
September 19, 2020 Committee Report: Multi-Use Path Update Construction has begun on the 2.6 mile Multi-Use Path project along Modoc and Las Positas roads. This is a 12’ wide paved…
September 19, 2020 Committee Report: Multi-Use Path Update Construction has begun on the 2.6 mile Multi-Use Path project along Modoc and Las Positas roads. This is a 12’ wide paved…